The People’s CTMP is a public mandate for engineered abundance. The Wall is a name-only registry for people who support treating stable, affordable, renewable energy as civilizational infrastructure, not a commodity to extract from.
The Canal & Transshipment Mega Project (CTMP) is a 300 GW gravity-powered energy platform designed to deliver firm baseload electricity at 2.5¢/kWh under a posted tariff.
It integrates 17 industrial verticals including steel, concrete, TBMs, HVDC transmission, desalination, green molecules, chip fabrication, and data infrastructure.
The People’s CTMP is the public-facing structural pivot: a civic declaration that this must be built in a way that stays tariff-governed and resistant to capture.
This is a name-only registry. No money. No investment. No expectation of return.
If the button is not active yet, the form is being connected. This page is the single point of truth.
Governance note: the enforcement framework is referred to as the Sovereign Logic Engine (SLE) and the Stewardship Charter. Public materials stay order-of-magnitude and replication-safe.
The People’s CTMP is stewarded by HLX. This site is the canonical reference point for the public initiative and The Wall.
Contact: [add contact method later]